The Buttery

The galleries depicted here only show the rough finish of the interior. The final product was insulated, powered and finished with raw wood paneling. “The Buttery” was built in the autumn of 2010.

Almost ten years after it was built.

Almost ten years after it was built.

The Exterior


The Interior


The building was later upgraded with power and finished with wood paneling.

Previous
Previous

20x20 +Porch She-Shed

Next
Next

Office Remodel