The Buttery
The galleries depicted here only show the rough finish of the interior. The final product was insulated, powered and finished with raw wood paneling. “The Buttery” was built in the autumn of 2010.
The Exterior
The Interior
The building was later upgraded with power and finished with wood paneling.